Delete
Material
Harvesting Location/Method
Processing Location/Method
Manufacturing Location/Method
Embedded Energy
Choose a Location:
Choose a harvesting location No Location Available Lone Star, TX Middletown, OH Default Material Distance
Method :Iron ore mining(There is only one option)
Always 250.00 miles from harvesting
Method :Hot / cold rolling (average)(There is only one option)
Same location as processing
Method :
Choose a Manufacturing Method Fabrication Steel fabrication
220
BTUs
Location: Default
Method :Raw materials excavation(There is only one option)
Location: Default
Method :Batch preparation, melting, refining (glass)(There is only one option)
Location: Default
Method :Forming and post-forming (flat glass)(There is only one option)
75
BTUs
Location: Default
Method :Linseed oil refining, pine resin extraction, wood and cork powder production(There is only one option)
Location: Default
Method :Processing of Linseed Oil, Rosin, mixing of solution(There is only one option)
Location: Default
Method :Combination of linseed oil mixture and titanium dioxide (There is only one option)
37,479
BTUs
Choose a Location:
Choose a harvesting location San Antonio, Texas Texas China Louisiana China Russia Default Material Distance
Method :Bauxite to alumina (15% recycled)(There is only one option)
Choose a Location:
Choose a processing location Ohio San Antonio, Texas Louisiana Texas Default Material Distance
Method :Smelting / Hall-Héroult process (15% recycled)(There is only one option)
Choose a Location:
Choose a manufacturing location Los Angeles, California Ohio Florida Michigan California Indiana Default Material Distance
Method :Fabrication (Aluminum)(There is only one option)
37,479
BTUs
Choose a Location:
Choose a harvesting location San Antonio, Texas China Texas China Louisiana Russia Default Material Distance
Method :Bauxite to alumina (90% recycled)(There is only one option)
Choose a Location:
Choose a processing location Texas Ohio San Antonio, Texas Louisiana Default Material Distance
Method :Smelting / Hall-Héroult process (90% recycled)(There is only one option)
Choose a Location:
Choose a manufacturing location Los Angeles, California California Ohio Indiana Florida Michigan Default Material Distance
Method :Fabrication (Aluminum)(There is only one option)
37,479
BTUs