Project Details

Glass Topped Table
Glass Topped Table

This is a project brief.

Location

Javascript is required to view this map.

Location


4550 30th street
NY 11
United States
40.766792
-73.922191

Project Calculator

Total embedded energy

47,159,359
BTUs

This energy is equal to

  • Tons of Carbon per year
  • Light bulbs per hour
  • Cars on the road per year

Energy Calculator

Delete Material Harvesting Location/Method Processing Location/Method Manufacturing Location/Method Embedded Energy
Maple purebond particle board (80% recycled)
% from recycled materials
No Location Available
:Recycled material collection(There is only one option)
No Location Available
( 0.385827936663 miles from previous location)
:Wood preparation (MPPB)(There is only one option)
Choose a Location:
:Maple Purebond Manufacturing(There is only one option)
3,703,240
BTUs
Aluminum
% from recycled materials
San Antonio, Texas
:Bauxite to Alumina(There is only one option)
San Antonio, Texas
( 12.4054489806 miles from previous location)
:Fabrication
Choose a Location:
:Anode then Smelting
2,720,481
BTUs
Aluminum
% from recycled materials
Choose a Location:
:Bauxite to Alumina(There is only one option)
Choose a Location:
:
Choose a Location:
:
27,157,092
BTUs
Cherry Veneer
% from recycled materials
Choose a Location:
:Chainsaw felling (cherry veneer)(There is only one option)
Choose a Location:
:No Method Available
Choose a Location:
:
13,578,546
BTUs